Completion Design Assessment

IESL has completed a well completion design assessment work for an operator in Southern Australia. The work included the use of existing engineering data to validate geomechanical models that allowed the user to select the optimum completion design for the field.

Innovative Engineering Systems Limited logo
[trx_twitter count="3"]