Based on the existing work developed with RIL, this module assess the actual performance based on a criteria that mixes, technical, economic and operational parameters. It allows evaluation of performance for water injection wells or plant systems
- Performance verification based on II – Computation only
- Economics of the well/plant – Calculation only
- Plant efficiency– Calculation only
- Benchmarking with other reservoirs (UKCS only) – From existing data sets
- Well Operating limits– Calculation only
- Performance summary table
- Thermal fracture pressure drop – Computation only
It will use the existing dashboard, no other output will be given at this point